Physical Infrastructure and Costs MCQs Quiz Online PDF Book Download

Physical infrastructure and costs multiple choice questions (MCQs), physical infrastructure and costs quiz answers to learn computer science degree online courses. Request level and data level parallelism MCQs, physical infrastructure and costs quiz questions and answers for computer technology degree online. Learn google warehouse scale, physical infrastructure and costs test prep for cisco certifications.

Learn request level and data level parallelism MCQ: efficiency for turning 115,000-volt power into 208-volt power, which servers can use is,, with choices 80%, 82%, 84%, and 89% for computer technology degree online. Practice merit scholarships assessment test, online learning physical infrastructure and costs quiz questions for competitive exams in computer science major .

MCQs on Physical Infrastructure and Costs PDF Book Download

MCQ: Efficiency for turning 115,000-volt power into 208-volt power, which servers can use is,

  1. 80%
  2. 82%
  3. 84%
  4. 89%

D

MCQ: Power-utilization effectiveness median is

  1. 1.69
  2. 1.54
  3. 1.23
  4. 1.42

A

MCQ: Warm water flowing over a large surface within tower, for transfer of heat to outside air through evaporation, technique is known as

  1. Sharding
  2. Airside economization
  3. Outside economization
  4. Both a and b

B

MCQ: Increased time for next clicking (ms) for 200 server-delay (ms) is

  1. 200
  2. 500
  3. 800
  4. 900

B

MCQ: A widely used, metric for evaluating efficiency of data-center or a WSC, is called

  1. Sharding
  2. Air utilization effectiveness
  3. Power utilization effectiveness
  4. Data utilization effectiveness

C