Physical Infrastructure and Costs MCQs Test Online pdf Download

Practice MCQs on physical infrastructure and costs with CA tests for online test prep and learning. Free study guide has multiple choice questions (MCQ) with physical infrastructure and costs quiz as efficiency for turning 115,000-volt power into 208-volt power, which servers can use is,, answering options 80%, 82%, 84% and 89% for exam prep. Study to learn physical infrastructure and costs quiz online with MCQs to practice test questions with answers.

MCQs on Physical Infrastructure and Costs

MCQ. Efficiency for turning 115,000-volt power into 208-volt power, which servers can use is,

  1. 80%.
  2. 82%.
  3. 84%.
  4. 89%.

D

MCQ. Power-utilization effectiveness median is

  1. 1.69.
  2. 1.54.
  3. 1.23.
  4. 1.42.

A

MCQ. Warm water flowing over a large surface within tower, for transfer of heat to outside air through evaporation, technique is known as

  1. Sharding.
  2. Airside economization.
  3. Outside economization.
  4. Both a and b.

B

MCQ. Increased time for next clicking (ms) for 200 server-delay (ms) is

  1. 200.
  2. 500.
  3. 800.
  4. 900.

B

MCQ. A widely used, metric for evaluating efficiency of data-center or a WSC, is called

  1. Sharding.
  2. Air utilization effectiveness.
  3. Power utilization effectiveness.
  4. Data utilization effectiveness.

C

DMCA.com Protection Status